Getting Brave – Toe dipped, Now to jump in (Fire #5)

Getting Brave – Toe dipped, Now to jump in (Fire #5)

Successful tests lead me to my first “real” project load.   Wind chime (layered, stringers, frit, and scrap), returning the previously tack-fused piece to full fire, and testing “stained glass” to full fuse.  Auto, Med, Full Fuse.

The results for the wind chime – awesome!  It’s beautiful and it going to look great.

The refired tack-fuse piece looks much better.  Next step is to slump it.

The stained glass, though, that is a fail.  It’s chalky, brittle, and just not pretty.

Started the load at 5:30 pm.  Wanted to see if it would be cool enough by morning.  It wasn’t.   I’m determined to find the right time to start to be able to open next morning!

Close Menu